After partial loading, the groundcrew oversee 58047 'Manton Colliery' running round its train at Kiveton Colliery on 19/11/1992. The last shift worked in September 1994. A skeleton workforce along with contractors remained to close and demolish the colliery after almost 130 years of production. In 1995 the headgear was pulled down.
6G42 Kiveton Colliery-West Burton Power Station with 58047 'Manton Colliery' providing the power is drawn forward whilst being loaded at Kiveton Colliery on 19/11/1992. After partial loading, the groundcrew oversee 58047 'Manton Colliery' running round its train at Kiveton Colliery on 19/11/1992. The last shift worked in September 1994. A skeleton workforce along with contractors remained to close and demolish the colliery after almost 130 years of production. In 1995 the headgear was pulled down.
58047 'Manton Colliery' draws 6G42 Kiveton Colliery-West Burton Power Station forward as loading is almost complete whilst 58018 'High Marnham Power Station passes with an Oxcroft Opencast Disposal Point-Cottam Power Station train at Kiveton Colliery on 19/11/1992. The last shift worked in September 1994. A skeleton workforce along with contractors remained to close and demolish the colliery after almost 130 years of production. In 1995 the headgear was pulled down.