58024 passes Hall Lane Jnct and heads towards Foxhall Jnct with a 'merry go round' coal train from Oxcroft Opencast Disposal Point to Cottam Power Stationson 19/11/1992. The locomotive would need to run round at Woodhouse Jnct in order to be able to gain the line through to Worksop. The lines are now closed and track lifted.
After partial loading, the groundcrew oversee 58047 'Manton Colliery' running round its train at Kiveton Colliery on 19/11/1992. The last shift worked in September 1994. A skeleton workforce along with contractors remained to close and demolish the colliery after almost 130 years of production. In 1995 the headgear was pulled down.
6G42 Kiveton Colliery-West Burton Power Station with 58047 'Manton Colliery' providing the power is drawn forward whilst being loaded at Kiveton Colliery on 19/11/1992. After partial loading, the groundcrew oversee 58047 'Manton Colliery' running round its train at Kiveton Colliery on 19/11/1992. The last shift worked in September 1994. A skeleton workforce along with contractors remained to close and demolish the colliery after almost 130 years of production. In 1995 the headgear was pulled down.