With the night sky darkening D306 (40106) stands at Wansford on 26/02/2006 with the Nene Valley Railways steam crane.
The crew oblige and switch on the cab lights, whilst the crane steams away merrily as D306 (40106) stands at Wansford on 26/02/2006.
D306 (40106) heads the Nene Valley Railways breakdown train at Wansford on 26/02/2006.
D306 (40106) clears its tubes whilst standing at Wansford on the Nene Valley Railways breakdown train on 26/02/2006.
With the crane steamings away merrily, the crew of D306 sit patiently as the breakdown train sits at Wansford on 26/02/2006.
56057 awaits entry to Wansford station with a ballast train on 26/02/2006.
Almost ready to go, the headlight on 56057 is switched on as the train awaits entry to Wansford station with a ballast train on 26/02/2006.
With the road clear, 56057 has all lights illuminated and prepares to move off at Wansford on 26/02/2006.
D306 (40106) and ts breakdown train stand alongside Wansford signal box awaiting entry to Wansford station on 26/02/2006.
56057 stands in Wansford station on a short ballast train on 26/02/2006.
The signaller fills in his log book as D306 (40106) and ts breakdown train stand alongside Wansford signal box awaiting entry to Wansford station on 26/02/2006.
D306 (40106) stands at Wansford station on 26/02/2006 with the Nene Valley Railways breakdown train.