With loading completed 37800 'Glo Cymru' crawls away from Tower Colliery at Hirwaun and heads down the Vale of Neath line towards Aberdare with 7C88 1556 SX Tower Colliery-Aberthaw Reception Sdgs on 17/07/1992.